In this write-up I will explain the typical fundamental demands of an audio, modern-day high stress, straight installment. The adhering to summary connects to a contemporary high stress (400/600Kpa) system generally made by Kwikot South Africa.

geyser installationgeyser installation


Much less typical are old reduced pressure systems (100kpa) open pipe or "Latco" type systems. Be aware that the components are NOT interchangeable in between both distinct systems - High stress as well as Reduced stress! It is feasible to eliminate an old low stress system as well as change it with a modern-day high pressure system nonetheless - you purchase a new high pressure geyser and also mount it according to the current spec.



The hot spring rests in a tray made of plastic (commonly red) or tin plate. I prefer the plastic ones.

Given that June 2001, the drip tray is not optional - its obtained to be there as well as there has to be a drainpipe pipeline for it! The drain is a 50mm PVC waste pipeline that drains the tray by piping the water out the house (geyser installation).

Geyser Installation for Dummies

The next most visible function would be the. These are small brass parts installed at the end of a 30cm size of pipeline. The two vacuum cleaner breakers stand vertically about 30cm over the hot spring. These are essential, as they stop water siphoning out the geyser when the cold supply is stopped.

Keep in mind that vacuum cleaner breakers are a fairly new need - there are still thousands of old HP systems out there without vacuum cleaner breakers and also I am yet to see one collapse. Simply since I haven't seen it does not imply it's not happening!

The chilly water side is the side that directly links to the drain cock and also enters the hot spring at the bottom. After the shut off shutoff you would normally locate a Pressure Control Valve (PCV). There are a variety of different types, mainly made of brass yet some are constructed from plastic.

This is where the PCV launches stress as well as this is the pipe that usually trickles. Don't stress if you can not discover the PCV following to the hot spring - it may be totaled 10 metres away, typically in a much more easily Continue accessible put on a wall surface outside. Occasionally it's in a little plastic box exterior.

Not known Details About Geyser Installation

This valve must have a steel (copper or steel) pipeline linked to it and also the pipeline need to lead straight out the building. This air vent pipeline is an essential safety function of the entire system.

The T&P shutoff is the least optional part - it needs to exist! - The weight of the geyser have to be effectively sustained on the roof covering trusses - a minimum of two assistances under the 'feet' of the geyser. If it looks shaky get a plumbing professional to examine it out.

The geyser has to be earthed! I have actually seen several geysers with the earth cable unconnected. All the copper pipes must likewise be earthed and adhered to the geyser earth.


Once more, these are often simply left existing next to the geyser. There are basically only 2 main thermostat types - the modern round "Kwiktherm" in more recent Kwikot geysers and also the VK (rectangle-shaped block) kind in older geysers and also in some newer non-Kwikot devices. The geyser may be fed (cold water) with polcop (plastic) pipeline - as much moved here as the turned off valve, yet the pipeline into as well as out of the geyser should be copper or galvanized steel.

The 10-Minute Rule for Geyser Installation

geyser installationgeyser installation


The hot water side need to be copper, steel or suitably ranked (70) plastic or composite pipeline. Note that index you have to have at least 1m of copper/steel pipe out the hot spring - you might not attach plastic (composite) pipeline straight to the hot spring. As above, the PCV as well as T&P need to be constructed from copper or steel - particularly the vent out of the T&P valve.

geyser installationgeyser installation


I have actually seen a number of installments where the installer has simply run a brief size of 22mm copper right into the drip tray with the suggestion being that the T&P can vent directly into the drip tray. A concept due to the fact that the hot (100 +) water/steam thaws the drip tray and also the PVC drain pipeline.

The PCV is usually above the hot spring as well as the cool water flows down right into the hot spring. This is quite important due to the fact that it forms an anti-syphon loophole that avoids the geyser from draining pipes back via the inlet in the event of a supply of water failure. If you fume water coming out your cool faucets when the water supply falls short after that this is not working properly.